TriStar MPPT 600V Installation & Operation Manual
23TriStar MPPT 600V Operator’s Manual
Step 3 - Remove the Knock-Outs
Plan the routing of each conductor that will connect to the TriStar MPPT 600V before removing
any knock-outs. The 1/2” (M20) knock-outs are ideal for routing network cables, which must be
placed in separate conduit.
Useaatheadscrewdrivertoremovethenecessaryknock-outs.Ahammermayalsobere-
quired to apply extra force. Refer to Section 3.2 for detailed knockout information.
WARNING: Shock Hazard
Always use bushings, connectors, clamp connectors, or wire glands in the knock-out openings to
protect wiring from sharp edges.
PRUDENCE : Risque de décharge électrique
Utilisez toujours des bagues, des connecteurs, des raccordements à collets ou des fouloirs dans
les ouvertures an de protéger le câblage des bords coupants.
WARNING: Shock Hazard
Never route network cables in the same conduit as the power conductors.
AVERTISSEMENT: Risque de décharge électrique
N’acheminez jamais les câbles réseau dans le même conduit que les conducteurs
d’alimentation.
Step 4 - Mount to a Vertical Surface
!
CAUTION: Risk of Burns
Install the TriStar MPPT 600V in a location that prevents casual contact. The TriStar MPPT 600V
heatsink can become very hot during operation.
M6 Screw
Mounting Hanger
Figure 3-10. Attaching the mounting hanger
1. Attach the mounting hanger to the bottom of the TriStar MPPT 600V with the M6 screw pro-
videdasshowningure3-10.
2. Place the TriStar MPPT 600V on a vertical surface protected from direct sun, high tempera-
tures, and water. The TriStar MPPT 600V requires at least 6” (150 mm) of clearance above