NOTE:
For multiple TriStar MPPT 150V controllers on a MeterBus
TM
network, initialize a battery
equalization using the TriStar meter so that all controllers are synchronized.
REMARQUE :
Avec plusieurs contrôleurs TriStar MPPT 150V sur un réseau MeterBusTM, initialisez une
compensation de batteries à l’aide de l’outil de mesure TriStar an de synchroniser tous les
contrôleurs.
Note that if two or more TriStar MPPT 150V controllers are charging in parallel, each controller
may attempt to equalize on a different day. Systems with multiple controllers should only equalize
manually to ensure synchronization between controllers.
4.4 LED Indications
Valuable information can be provided by the three LEDs visible through the front cover. Although
there are many different LED indications, they have similar patterns to make it easier to interpret
each LED display. Consider as three groups of indications: General Transitions // Battery Status
// Faults & Alarms.
LED Display Explanation
G = green LED is lit
Y / R = yellow LED is lit, then red LED is lit
G+Y = Green and Yellow are both lit at the same time
R+Y / G = Green & Yellow both lit, then Red is lit alone
Sequencing LED patterns (faults) repeat until the fault is cleared
General Transitions
• Controller start-up G / Y / R (one cycle)
• Equalize request start G+Y+R / G+Y+R / G / G
• Equalize cancelled G+Y+R / G+Y+R / R / R
• Battery service is required* all 3 LEDs blinking until service is reset
*battery service notication is only enabled in custom settings
Battery Status
• General state-of-charge see battery SOC indications below
• Absorption state G blinking (½ second on / ½ second off)
• Equalization state G fast blink (2.5 times per second)
• Float state G slow blink (1 second on / 1 second off)