DIAGRAM: Load Control w/SureSine Inverter

Diagram #1 (applicable with all inverters)
IMPORTANT:
This is not intended to be a complete system diagram; fusing, discon-
nects, and grounding should comply with local electric codes.
Notes:
The Inverter cannot be connected directly to the Load +/- terminals of the TriStar Load Controller. Instead, •
it is connected directly to the battery bank.
In order to use the TriStar Load Control with the inverter connected directly to the battery bank, a Relay •
must be used.
A Relay is connected in series between the battery bank and inverter DC input. The Relay is controlled by •
the TriStar Load Controller. Via the Relay, the TS is able to control when the inverter is ON or OFF.
Ensure that the Relay is rated to handle the full DC surge current drawn by the inverter.•
For detailed installation information, please consult the respective product manuals (TriStar, Inverter).•
page 2 of 3page 2 of 3
12 Volt
+
-
+
-
GND
TriStar
(Load Control Mode)
Normally
Open (N/O)
Relay
SureSine Inverter
AC Loads
Load -
Load +
Battery -
Battery +
GND
GND
BLACK
WHITE
FUSE
FUSE
FUSE