User manual

B) Verify that Lighting Enabled reads “enabled”. Verify that Lighting chan 0 timers reads
“turn on at sunset, turn off at sunrise”. Note that the 12V/24V settings are the same and
that you can stretch the columns to see any text which has been cut-off.
C) Do not close the SSMPPT Setup Wizard.
STEP 5: Prepare SunSaver MPPT for Programming
A) The SSMPPT now needs to be programmed with the new lighting/load control settings.
Connect the PC to the serial (9 pin) input of the PC MeterBus Adapter (model: MSC) using
a direct serial connection or a USB/Serial adapter. Use the serial cable provided with the
MSC adapter.
page 10 of 18