Installation manual

© 2014 EcoInnovation Ltd (NZ) Page 27
4.4. Siting your PowerSpout turbine
Some tips for locating a good site for your turbine include:
4.4.1. Choose a place that is accessible.
If necessary make steps and put in rope handrails to ensure that your turbine can
be accessed safely.
4.4.2. Choose a site that has the most fall
You should position the PowerSpout to obtain the greatest fall (head of pressure) possible
with the shortest length of pipe. If it makes the cable unacceptably long then look at using
MPPT to raise the cable voltage.
In many situations it is possible to divert the pipeline closer to the home to provide a
pressurised water supply as well as electrical generation. In combined power and water
schemes electric power is often employed to UV treat the water. In some cases the
PowerSpout is only used for UV treatment at remote water storage tanks for small
communities. This is often more cost effective that installing grid power to the site.