Installation manual
© 2014 EcoInnovation Ltd (NZ) Page 118
11. Examples of good hydro system installations
Taking care in planning and installation, completing all commissioning tests, and observing
and documenting correct operation are all the responsibility of the installer. Pictures of
various installs follow, in the hope that these assist you in doing a quality job.
11.1. Good installations
This turbine install includes:
Pressure gauge
Good solid mounting platform
Good water exhaust system
Clean and tidy install
Good all round access for servicing
Note the following in this Outback prewired inverter
system:
Dry and insect/pest free install location
Clean and tidy
Smoke alarm
Dry powder fire extinguisher
Meter for permanent record of kWhrs AC supplied
DC hydro off breaker (left white box)
Clear labels
Features of this 48 V DC battery room include:
Well vented, clean and tidy, lockable
Battery retention strap (earthquake restraint)
Distilled battery top up water on hand
Dry powder fire extinguisher
Emergency eye wash
Tool box with goggles, gloves and apron
Smoke alarm
All battery terminals covered to prevent corrosion and
drop hazards
Safety emergency signs and log book
Main DC disconnection point and fuse
In this grid tied system note the:
Tidy installation
Installer identification label
Clear labels