© 2014 EcoInnovation Ltd (NZ) Page 11
check for excessive noise.
complete turbine testing and commissioning.
ensure that all protective fairing/enclosures are in position after commissioning and prior
to client hand over.
comply with signage requirements as listed in relevant national standards
complete all documentation as required in this manual and local wiring rules.
make relevant notes in the manuals that will be of assistance to future service personal.
train the end owner/user of the turbine in routine care and maintenance of the hydro
system.
The following safety warning signs are used throughout this manual.
Caution
Risk of electric shock that could result in personal injury or loss of life
Caution
Cautions identify condition or practices that could result in
damage to equipment or personal injury, other than by electric shock.
1.3. CE and FCC Declaration
Refer to http://www.powerspout.com/compliance/ for compliance declarations documentation
and EMC test reports.
PowerSpouts products are CE, FCC and C-tick compliant.
PowerSpout dealers may request to see the Compliance Folder if required by authorities.
1.4. Standards and certification
All PowerSpout turbines have been evaluated against major international standards.
Refer to http://www.powerspout.com/compliance/
1.5. Pre-requisites
All PowerSpout hydro schemes are assumed to be in the following conditions:
Run of river (unless advised otherwise).
Areas free of combustible materials. Assess fire risk of the installation site, and if high
implement extra fire precautions as appropriate. In environments where combustible
materials are present the turbine must be mounted in a concrete or metal enclosure.
Clean river water that will not corrode aluminium parts (sea water is permitted by special
request only).
Temperate climate. Do not install in situations where the pipe line may freeze or in
temperatures below -15°C.
Terrain that can be walked over safely for pipe laying etc. (i.e. no large vertical drops).
The client confirms that the site is unlikely to: slip, have rock falls, flood, earthquake etc.
Where such conditions exist the client has taken appropriate measures.