Both the boiler and the central heating installation should have been purged
of any air
in
the
CH
circuit which may cause noise/malfunctions/damage to
the boiler. The boiler
is
fitted with two automatic air vents:
1.
One
is
located
on
the pump
AUTOMATIC
AIR
VENT
......
......
2.
The other
is
located externally on top
of
the boiler
AUTOMATIC
AIR
VENT
Always ensure that both the caps on the automatic air vents are
loose prior
to
commissioning.
6.4 CONDENSATE TRAP
Ensure the trap
is
full with 1 litre of water. (See 5.5.)
Ensure all connections are water tight and that the condensate discharge pipe
is correctly installed (see 5.6.).
6.5 FLUE CONNECTIONS
Ensure that the flue has a fall
of
2-3 degrees back towards the
boiler.
Make sure that the air intake and the flue outlet are not blocked.