Operation Manual
5.2 GAS AND WATER CONNECTIONS
Connect the boiler up in such a way as to leave the connecting pipes self supporting
and free from any stress. The Gas pipe must
be
supported by a clip to the bulkhead.
Check the gas pipe complies with the requirements in section 4.5.
Gas and water connections are made to the boiler as
in
the diagram below:
I
®
'
CD
'
®
0
171
2
~
3
0
4
1.
CH
Flow-%"
BSP
2.
DHW
Outlet-
%"
BSP
3.
Gas
Inlet-%"
BSP
4.
DHW Inlet
(mains)-%"
BSP
5.
CH
Return -
%"
BSP
6.
Condensate Drain
7.
Pressure Relief- 15mm copper stub pipe
0 7
0
5
21