Instructions)
7) Install the 11-213 board into the cabinet with the three 15mm nylon hex nuts.
8) Install the following panel components into the front panel locations listed (shown in gure 6). For the pots and
jacks, use a lockwasher between the component and the inside of the panel. On the outside of the panel install
the atwasher between the nut and the panel:
Jacks install in locations Audio Out, Phones Out
50KB potentiometers install in locations Brightness, Waveform
5KB potentiometers install in locations Pitch, Volume
50KA potentiometer install in location Phones Vol.
Power switch install in location Power
gure 5
gure 6
9) Make sure the Potentiometers are installed so the leads are closest to the top of the enclosure are uniformly
straight.