Instruction manual

Figure 5. Completed back frame Fireplace installation
Back framing the Fireplace
NOTE: Maintain a 1" clearance around the throat (projection at the front of the replace that holds the glass door) when installing 2x4s
for back framing�
Step 1)� Cut and install one 2x4 to t horizontally under the replace throat.
Step 2)� Cut and install required quantity of short ller 2x4's to t vertically under the horizontal piece.
Step 3)� Cut and install four vertical 2x4's. Place 2 on each side of the replace throat.
Step 4)� Join the two steel header pieces to get the required length, see chart below for steel header measurements�
Step 5)� Install supplied steel header 1" above the throat. Attach steel header to vertical 2x4's as shown in gure 5
Step 6)� Cut and install one horizontal 2x4 below the top frame�
1” clearance
1” clearance
Model
Supplied Steel
Header
Measurements
Installed Steel
Header
Measurements
R720*
80" x 3" - qty 2 95" x 3"
R820*
80" x 3" - qty 2 107" x 3"
Steel header
(supplied by Montigo)
2-pcs 2 x 4 (vertical)
Both Sides Typ.
1” clearance 1” clearance
2
x 4
(horizontal)
2 x 4
(horizontal)
2 x 4
(Vertical)
R720 & R820 Power Vent Indoor Gas Fireplace
Page 11
XG0772 - 100614
Installation