Specifications
As shown in Figure 19; Install the supplied Non-combustible cement board to overlap the new Horizontal & Vertical 2 x 4's, See Figure 5.
Place the Non-combustible wall board above the replace throat, allowing 1/8" clearance from the rim above the replace opening. Pre-drill
the board with 1/8" drill and secure to framing with Nails, use at heat sheet metal screws to fasten the board to the metal header.
(Non-Combustible cement board R520*: 72" x 15 1/2" R620*: 82 1/2" x 15 1/2" x 3/8")
Non-combustible Board over the Fireplace, (supplied by Montigo).
Non-Combustible cement board,
(supplied by Montigo) or Equiv.
Pre-drill for Nail fasteners
Combustible framing
Sheet metal Screws to attach Non-Combustible
cement board to Steel header.
1/8”
Clearance required for
expansion of the fireplace
when in operation.
Section 7: Finishing the replace
Wall board / Gyproc or
Equiv. (Bottom & Sides)
Cut standard Gyproc / Drywall board to complete the installation of the surround. Fit the edge of the board to the rim around the replace
opening. Fasten the board in place using standard drywall screws.
Fireplace installation (Cut the remainder of Gyproc / Wall board to complete the replace surround).