Specifications
Place the Fireplace on the platform and install the Vent pipe, and Power Vent module. Next, connect the Gas line, and provide a gas service
shut-off valve; according to local gas codes. Before fastening in place Line up the front face of the replace (top and bottom), Figure 3. then
secure in place with 1/4"bolts and washers to the platform.
F
ireplace installation, (Inlet Gas & Power Vent).
Installing the Fireplace:
1/2”
Supply Gas
connection
Intake / Exhaust
Vent Pipe (5”/10”)
2” Clearance
2” Clearance
Page 10
XG0771 - 040513










