Owner`s manual
Page 6
L42DF Flush Indoor Gas Fireplace
Part No. XG0181 - 081009
f i r e f e a t u r e
3.5”
Installation
Installing Terminations with Built-In Frames
Installing Terminations with MSR Frames
12
12
1. Frametheterminationopeningto12"x12".
2. Fasten the termination to the studs using a minimum of 4 screws.
11
11
1. Frametheterminationopeningto11"x11".
2. Fasten the termination to the studs using a minimum of 4
screws.
Installing Terminations with MOSR Frames
1212
12
MOSR
1. Frametheterminationopeningto12"x12".
2. Fasten the MOSR frame to the interior side of the studs using a
minimum of 4 screws.
3. Insert the termination into the MOSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.
MSR
PTO-3 (5"/8")
PTO-3F (5"/8")
PTO-3 (5"/8")
PTKOG (5"/8")
1. Ensure that the two long mounting brackets are facing the bottom
of the termination. (See inset). This will provide more heat protection
at the top of the termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four sheet metal
screws.
3. If installing the termination over Vinyl siding, Use the VSS Termination
shield. Montigo Installation document, XG1301.
Installing Heat Guards over Terminations
Installing The Remote Switch
The L42DF's gas valve, located behind the lower trim, may be connected
to a wall switch. The valve generates its own power on a millivolt circuit.
Use only low voltage wire, and DO NOT connect any external power to it.
Note:Theswitchlocationmustnotexceed30'fromthereplace.
Installing The Standoffs
To avoid elevated mantel temperatures, all L42DF gas
replaces are required to have the supplied standoffs installed.
The replaceissupplied with two standoffs.Bend and install these
standoffsontopofthereplaceensuringthattheheightofthestandoff
maintainsa3-1/2"clearance.
Figure 6b. Installing the L42DF standos.
Figure 6. Installing the VSS Vinyl Shield.
Figure 5a. Installing a PTO termination.
Figure 5b. Installing a PTO termination with the MSR frame.
Figure 5c. Installing a PTO termination with the MOSR frame.
Figure 5d. Installing a PTO termination heat guard.










