Installation
The RHS8 Heat shield be used when the Termination is
() from the replace, or directly
off the rear of the replace, as shown gure 19a. The RHS101 Heat
Shield (Figure 19c and 19d) be used within the noted dimensions.
To install the RHS8, frame an opening in combustible construction,
Figure 19 below. Slide the Heat shield in place over the vent pipe
which attaches to the replace. After the replace and vent pipe has
been installed, clearances should match the dimensions in Figure 19.
RHS8 Installation. (Install by sliding over vent pipe where it passes
through the combustible contruction).
RHS101 Installation. (Install by sliding Outer Section over vent pipe
where it passes through the combustible construction.
Heat Shield. After sliding the outer section in place.
The RHS101 Heat shield be used where the RHS8 Termination
(Figure 19 and 19a) be used. Use the RHS101 where any
of the dimensions are within the parameters shown, gure 19a.
To install the RHS101, Slide the Inner Section over the vent pipe that
will connect to the replace. Then fasten the vent pipe to the back of the
replace with a minimum of three sheet metal screws. From the outside
slide the RHS101 outer section on see Figure 19c. To complete the
installation fasten the Heat Shield Outer Section & Termination frame
to the structure Figure 19d.
RHS8 Installation within 6' (Minimum requirements).
RHS8 Heat Shield
1” Min. Both sides Typical
2” Min.
1” Min.
Combustible Framing
RHS8 Heat
Shield
36” Min
46” Min.
Termination
Termination
Drywall / sheetrock
RHS101 Heat Shield, inner Section
RHS101 Heat Shield
Outer Section
framing
Combustible
Termination
Drywall / sheetrock
RHS101 Heat Shield, inner Section
RHS101 Heat Shield
Outer Section