Owner`s manual
XG0147 - 011912.1
Installation
. Top vent, Roof mounted termination with no offset in vent run.
Top vent, Roof mounted with 1 offset (1 offset= two 90° bends).
Top vent, Roof mounted with 2 offsets (1 offset= two 90° bends).
The following details are some possible congurations for Roof mounted
terminations.
Support ring
Support plate
Firestop
32’ max.
2’ min.
PVTK1
Termination
Support ring
Support plate
Firestop
32’ max.
2’ min.
Obstacle
PVTK1
Termination
Support straps or
support plate & ring
2’ min.
Firestop
Firestop
2’
Firestop
3
2’ max
Support plate
& ring
Obstacle
PVTK1
Termination
The maximum termination point is 32’ above the replace (NOTE:
if the maximum termination height is used, the ame pattern
may be affected).
The Vertical termination must be a minimum 2’ higher than where
the termination exits the roong materials, (asphalt shingles,
cedar shakes, etc). This distance should be measured from the
high side of the roof slope where the ue ashing intersects the
roong materials. (see Figures 9 to 9c).
Termination location must be a minimum 6’ from a mechanical
air inlet.
Termination location must be a minimum 18” from a parapet wall
For a more detailed diagram of allowed termination locations,
see . .
A maximum of two offsets (each offset is made up of 2-90°
bends) may be made.
Firestops must be installed as required by National & local codes.
Ensure all runs are supported with a minimum of 3 supports
per 10’ of venting.
Install all roof ashing and storm collars as shown.










