Installation
1
12”
2”
1
2”
12”




1). Installation of Termination with built in frame
A Termination with a Built-In Frame is installed during
framing of a structure.
1. Frame the termination opening to 11" x 11".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of 4 screws.
MSR Frame
PTO-4 (5"/8")
Termination
PTO-4F (5"/8")
Termination
 Installing a PTO-F termination.
 Installing a PTO termination with the MSR frame.
 Installing the VSS Vinyl Shield.

The VSS Termination shield is installed when the exterior of a structure
is clad with Vinyl siding. It is placed directly above, and on-center with
the termination.

Terminations with a MSR frame allow the installation of the frame prior
to installation of the termination.
1. Frame the termination opening to 12" x 12".
2. Secure the MSR Frame to the exterior sheathing of the structure.
3. Fasten the termination to the MSR Frame using a minimum of 4 screws.
 Installing a PTO termination with the BSR frame.

Terminations with a BSR frame allow the installation of the frame in
masonry prior to the installation of the termination
1. Frame the BSR opening to 12" x 12".
2. Secure the BSR Frame to the exterior sheathing of the structure.
1. Frame the MOSR opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs, concrete,
or nished wall construction using a minimum of 4 screws.
3. Insert the termination into the MOSR frame as shown here, (from
the inside) and attach to the MOSR by installing a min. quantity of 4
bolts into the threaded nuts on the MOSR Frame.

A Termination with a MOSR Frame is installed from the inside of the
structure. These are commonly used in high-rise construction.
MOSR Frame
PTO-4 (5"/8")
Termination
 Installing a PTO termination with the MOSR frame.
BSR Frame
PTKOG (5"/8")
     is recommended in
installations where the termination is located within 7' feet above
grade, or above a pedestrian walkway, and may be Required by code
in Public areas.
1. Ensure that the two longmounting brackets are facing the bottom
of the termination. (See inset). This will provide more heat protection at
the top of the termination, where temperatures are highest.
2. Attach to the faceplate of the termination using four sheet metal
screws.
 Installing a PTO termination heat guard.
1
1”
11”
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
PTO-4 (5"/8")
Termination
Framing
Exterior
Sheathing
Fastening Hardware,
minimum 4-screws
12”
12”
Fastening Hardware,
minimum 4-screws
Framing, con-
crete or other
materials
Exterior Sheath-
ing, concrete or
other materials
Exterior Vinyl
siding
PTO-4 (5"/8")
Termination
VSS Vinyl shield