Owner`s manual

Page 6
H(L)38DF-PRC Indoor Panorama Gas Fireplace
Part No. XG0211 - 080510
3.0”
Section 2: Framing
Installation
1). Frame in the enclosure for the unit with framing materials. The
framed opening for the assembled replace is 40 7/8" wide, x 44"
high x 24 5/8" deep, see Figure 2
.
NOTE: When constructing the framed opening, please ensure
there is access to install the gas line when the unit is installed.
See Figure 22.
Figure 2. Framing dimensions.
Clearances
When installing a shelf over the top of the replaces, the following
guidelines must be adhered to:
For Rear Vent applications, the minimum clearance is 2" from the rear of
the replace to a wall, or any combustible materials, and 11" clearance
from the top of the replace to the underside of any combutible shelf
materials.
For Top Vent applications, the minimum clearance is 2" from the rear of
the replace to a wall, or any combustible materials, and 17 1/2" to the
underside of any combutible shelf materials.
(Minimum 2" clearance must still be maintained around the vent
pipes.)
Figure 4. Framing for shelves over the replace.
Top VentRear Vent
Installing The Standoffs
To avoid elevated mantel temperatures, all H*38PR* gas
replaces are required to have the supplied standoffs installed.
The replace is supplied with two standoffs. Bend and install these
standoffs on top of the replace ensuring that the height of the standoff
maintains a 3" clearance.
Figure 6. Installing the H*38PR* standoffs.
46”
17 1/2”
MEL Short
90 elbow
shelf
Framing / Header
44”
2 Min.”
11”
29
Framing Header
shelf
33”
44”
12”
Max
2 Min.”
24 1/2”
40 3/4”
44”
Clearance to Combustibles
Top- top vent 11"
Top- rear vent 17 1/2"
Header (from oor) 44"
Sides 0"
Front** 0"
Back 1"
Venting - top 2"
Venting- sides, bottom 1"