Spec Sheet
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
5 5/8”
Anti-Tip
Block
Side cleat
B
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
B
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
5 5/8”
Anti-Tip
Block
STANDARD INSTALLATION
FRONT VIEW
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
5 7/8”
Opening
height
7/16”
Product
Overlap
3/8”
Product
Overlap
5/8”
Product
Overlap
FLUSH INSET INSTALLATION
TOP VIEW
FLUSH INSET INSTALLATION
FRONT VIEW
1 7/16”
Cleat depth
Side cleat
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
28 1/2”
Cutout width
3/4”
Side cleats
1/2”
Top cleat
5 15/16”
Opening
height
6 15/16”
Flush inset
height
1/2”
Bottom cleat
(Extends full depth of cabinet)
30” flush inset width
with
1/8” reveals
Side cleat
Side cleat
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
28 1/2”
Opening width
For questions about your
appliance, please call 1-800-626-2000.
PAGE 3 OF 7 Product Specication Revised 10/21
FLUSH INSET INSTALLATION
STANDARD INSTALLATION
FRONT VIEW
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
5 7/8”
Opening
height
7/16”
Product
Overlap
3/8”
Product
Overlap
5/8”
Product
Overlap
FLUSH INSET INSTALLATION
TOP VIEW
FLUSH INSET INSTALLATION
FRONT VIEW
1 7/16”
Cleat depth
Side cleat
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
28 1/2”
Cutout width
3/4”
Side cleats
1/2”
Top cleat
5 15/16”
Opening
height
6 15/16”
Flush inset
height
1/2”
Bottom cleat
(Extends full depth of cabinet)
30” flush inset width
with
1/8” reveals
Side cleat
Side cleat
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
28 1/2”
Opening width
STANDARD INSTALLATION
FRONT VIEW
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
5 7/8”
Opening
height
7/16”
Product
Overlap
3/8”
Product
Overlap
5/8”
Product
Overlap
FLUSH INSET INSTALLATION
TOP VIEW
FLUSH INSET INSTALLATION
FRONT VIEW
1 7/16”
Cleat depth
Side cleat
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
28 1/2”
Cutout width
3/4”
Side cleats
1/2”
Top cleat
5 15/16”
Opening
height
6 15/16”
Flush inset
height
1/2”
Bottom cleat
(Extends full depth of cabinet)
30” flush inset width
with
1/8” reveals
Side cleat
Side cleat
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
28 1/2”
Opening width
A
If you are installing in frameless
cabinets, it may be necessary to install
1/2" wide cleats to accept drawer
mounting screws. See drawer for
mounting screw locations.
B
Install an anti-tip block against rear
wall, 5 5/8" from oor of cutout to
bottom of block. The anti-tip block
must be installed to prevent the drawer
from tipping forward when opened and
loaded. Failure to add the anti-tip block
could result in personal injury.
C
When installing the storage drawer
below a cabinet drawer, a solid barrier
must be installed at least above the
storage drawer to block access. Use
any solid material such as 1/4" thick
plywood. Allow at least 1/4" air gap
between the barrier and the top of the
storage drawer. Observe the 3/8" min.
above the toe kick installation height.
D
The storage drawer may be supported
by either a solid bottom or 2"x2" or
2"x4" runners. The support must be
level and rigidly mounted, ush with
the bottom edge of the cut-out (there
is no way to level the drawer once it
has been installed, so make sure that the
supports are level). The oor or runners
must be capable of supporting at least
65 lbs.
E
Cabinet surfaces must be an appearance
nished surface for ush installation.
F
Cleats may be visible and should be
nished to match cabinetry.
For more details refer to the installation
instructions for this product.
HELPFUL TIPS
STANDARD INSTALLATION
D
A
D E F
C
C