Spec Sheet

FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
5 5/8”
Anti-Tip
Block
Side cleat
B
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
B
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
5 5/8”
Anti-Tip
Block
STANDARD INSTALLATION
FRONT VIEW
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
5 7/8”
Opening
height
7/16”
Product
Overlap
3/8”
Product
Overlap
5/8”
Product
Overlap
FLUSH INSET INSTALLATION
TOP VIEW
FLUSH INSET INSTALLATION
FRONT VIEW
1 7/16”
Cleat depth
Side cleat
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
28 1/2”
Cutout width
3/4
Side cleats
1/2”
Top cleat
5 15/16”
Opening
height
6 15/16”
Flush inset
height
1/2”
Bottom cleat
(Extends full depth of cabinet)
30” flush inset width
with
1/8” reveals
Side cleat
Side cleat
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
28 1/2”
Opening width
For questions about your
appliance, please call 1-800-626-2000.
PAGE 3 OF 7 Product Specication Revised 10/21
FLUSH INSET INSTALLATION
STANDARD INSTALLATION
FRONT VIEW
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
5 7/8”
Opening
height
7/16”
Product
Overlap
3/8
Product
Overlap
5/8
Product
Overlap
FLUSH INSET INSTALLATION
TOP VIEW
FLUSH INSET INSTALLATION
FRONT VIEW
1 7/16”
Cleat depth
Side cleat
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
28 1/2”
Cutout width
3/4
Side cleats
1/2”
Top cleat
5 15/16”
Opening
height
6 15/16”
Flush inset
height
1/2”
Bottom cleat
(Extends full depth of cabinet)
30” flush inset width
with
1/8” reveals
Side cleat
Side cleat
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
28 1/2”
Opening width
STANDARD INSTALLATION
FRONT VIEW
STANDARD INSTALLATION
SIDE VIEW
22 1/8” Min
Opening depth
5 7/8”
Opening
height
7/16”
Product
Overlap
3/8
Product
Overlap
5/8
Product
Overlap
FLUSH INSET INSTALLATION
TOP VIEW
FLUSH INSET INSTALLATION
FRONT VIEW
1 7/16”
Cleat depth
Side cleat
FLUSH INSET INSTALLATION
SIDE VIEW
23 9/16” Min
Flush inset depth
Top cleat
Bottom cleat
28 1/2”
Cutout width
3/4
Side cleats
1/2”
Top cleat
5 15/16”
Opening
height
6 15/16”
Flush inset
height
1/2”
Bottom cleat
(Extends full depth of cabinet)
30” flush inset width
with
1/8” reveals
Side cleat
Side cleat
Drawer front has 1/2”
gap to cabinet front.
This will be visible in
standard installation.
28 1/2”
Opening width
A
If you are installing in frameless
cabinets, it may be necessary to install
1/2" wide cleats to accept drawer
mounting screws. See drawer for
mounting screw locations.
B
Install an anti-tip block against rear
wall, 5 5/8" from oor of cutout to
bottom of block. The anti-tip block
must be installed to prevent the drawer
from tipping forward when opened and
loaded. Failure to add the anti-tip block
could result in personal injury.
C
When installing the storage drawer
below a cabinet drawer, a solid barrier
must be installed at least above the
storage drawer to block access. Use
any solid material such as 1/4" thick
plywood. Allow at least 1/4" air gap
between the barrier and the top of the
storage drawer. Observe the 3/8" min.
above the toe kick installation height.
D
The storage drawer may be supported
by either a solid bottom or 2"x2" or
2"x4" runners. The support must be
level and rigidly mounted, ush with
the bottom edge of the cut-out (there
is no way to level the drawer once it
has been installed, so make sure that the
supports are level). The oor or runners
must be capable of supporting at least
65 lbs.
E
Cabinet surfaces must be an appearance
nished surface for ush installation.
F
Cleats may be visible and should be
nished to match cabinetry.
For more details refer to the installation
instructions for this product.
HELPFUL TIPS
STANDARD INSTALLATION
D
A
D E F
C
C