Installation Sheet

31-14900 Rev. 2
2
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
Ŷ:LWKWKHWHPSODWHWDSHGLQSODFHXVHDSXQFKWR
mark all mounting screw locations.
Ŷ'ULOO´SLORWKROHVDWWKHSXQFKHGORFDWLRQV
Ŷ5HPRYHWKHWHPSODWH
Ŷ7KHVXSSRUWEUDFNHWKROHVPXVWHQWHUVWXGVRUWKH
horizontal support.
Ŷ6HFXUHWKHPRXQWLQJEUDFNHWVWRWKHZDOOVWXGVZLWK
wood screws provided.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: Framing must be capable of
supporting 100 lbs.
,IGU\ZDOOLVSUHVHQWPDUNWKHVFUHZKROHORFDWLRQVIRU
the top mounting brackets. Remove the template.
Ŷ&XWDZD\HQRXJKGU\ZDOOWRH[SRVHYHUWLFDOVWXGV
at the bracket location indicated on the template.
Ŷ,QVWDOODKRUL]RQWDOVXSSRUWDWOHDVW[EHWZHHQ
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
Ŷ5HLQVWDOOGU\ZDOO
Installation Instructions
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
NOTE: 6FUHZV³$´DQG
“B” are pre-assembled
onto the brackets. Do not
remove these screws.
Screws
“B”
Screws
“A”
3
INSTALL DUCT BRACKET
The duct bracket must be installed against the ceiling.
This bracket will hold the decorative duct cover in
place at the top.
ŶInstall the 2 small screws into the sides of the duct
EUDFNHW5HPRYHWKHVFUHZV3UHWDSSLQJWKHKROHV
ZLOOLQVXUHHDVHRI¿QDOLQVWDOODWLRQ
Secure the bracket to the ceiling and wall:
Ŷ0DUNWKHVFUHZKROHORFDWLRQV
Ŷ'ULOOSLORWKROHVLQPDUNHGEUDFNHWORFDWLRQ
Ŷ,ISLORWKROHVGRQRWHQWHUVWXGVHQODUJHWKHKROHVWR
DQGLQVWDOOZDOOIDVWHQHUDQFKRUV
Ŷ'ULYHVFUHZVE\KDQGLQWRWKHIDVWHQHUVWRDOORZ
DQFKRUVWRH[SDQG5HPRYHWKHVFUHZV
Ŷ6HFXUHWKHEUDFNHWWRWKHFHLOLQJDQGZDOOZLWKZRRG
screws and/or fasteners.
Pre-Tap
Side
Screw
Pre-Tap
Side
Screw