Installation Guide

 31-2000900 Rev. 0
5
CONNECT DUCTWORK
Ŷ,QVWDOOGXFWZRUNPDNLQJFRQQHFWLRQVLQGLUHFWLRQRI
airflow as illustrated.
Ŷ3XVKGXFWRYHUWKHH[KDXVWRXWOHWXQWLOLWUHDFKHVWKH
duct stops.
Ŷ6HFXUHMRLQWVLQGXFWZRUNZLWKVKHHWPHWDOVFUHZV
Ŷ:UDSDOOGXFWMRLQWVZLWKGXFWWDSHIRUDQDLUWLJKW
seal.
Ŷ8VHGXFWWDSHWRVHDOWKHIODQJHFRQQHFWLRQ
CAUTION
Do not use sheet metal screws at the
hood flange connection. Doing so will prevent proper
damper operations. Seal connection with tape only.
ATTENTION
Il ne faut pas utiliser de vis
DXWRUDXUGHXVHVjODFRQQH[LRQGXFROOHWGHODKRWWH&HFL
HPSrFKHUDLWOHERQIRQFWLRQQHPHQWGXUHJLVWUH1¶XWLOLVHU
TXHGXUXEDQDGKpVLISRXUDVVXUHUO¶pWDQFKpLWpGXUDFFRUG
4
INSTALL THE HOOD
3ODFHWKHKRRGRQWKHEUDFNHWVDQGVOLGHOHIWRUULJKWWR
center.
$GMXVWWKHLQVWDOODWLRQOHYHOQHVVE\WLJKWHQLQJ
RUORRVHQLQJWKHVFUHZV³$´DWWKHERWWRPRIWKH
brackets.
2. Mark the 2 lower mounting holes.
3. Remove the hood from the wall.
4. Drill a pilot hole in each lower mounting hole
location. The two lower holes can be enlarged to
LIWKH\GLGHQWHUVWXGV7DSDQFKRUVIRUZDOO
fasteners into the bottom holes. Screws should be
inserted by hand into the fasteners to allow anchors
WRH[SDQGDJDLQVWWKHZDOOPDWHULDO5HPRYHWKH
VFUHZVIRU¿QDOLQVWDOODWLRQ
5. Replace the hood on the mounting brackets.
8VLQJWZRODUJHÀDWZDVKHUVVXSSOLHGLQVWDOOZRRG
screws or wall fastener screws.
7LJKWHQVFUHZV³%´ORFDWHGDWWKHWRSRIWKH
mounting bracket against the hood to clamp the
position. Do not overtighten screws.
Bracket Tabs
Screws
“B”
Screws
“A”
Installation Instructions
Screw
Duct Tape
Over Seam
and Screw
Air Flow
Duct Tape
Over Flange
Duct Stops