Installation
9
1 INSTALL FRAMING
FOR HOOD SUPPORT
IMPORTANT: Framing must be capable
of supporting 100 lbs.
Installation Instructions
If drywall is present, mark the screw hole locations for the
top mounting brackets. Remove the template.
• Cutaway enough drywall to expose 2 vertical studs at the
bracket location indicated on the template.
• Install a horizontal support at least 1" x 6" between two
wall studs at the top bracket installation location. The
horizontal support must be ush with the room side of
the studs. Use cleats behind both sides of the support
to secure the support to wall studs.
• Reinstall drywall.
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
2 INSTALL MOUNTING BRACKETS
This vent hood must be secured to the horizontal support or
wall studs.
• With the template taped in place, use a punch to mark
all mounting screw locations.
• Drill 1/8" pilot holes at the 6 punched locations.
• Remove the template.
• The 4 support bracket holes must enter studs or the
horizontal support.
Note: Screws “A” and “B”
are pre-assembled onto
the brackets. Do not
remove these screws.
Screws
“B”
Screws
“A”
• Secure the mounting brackets to the wall studs with
wood screws provided.