Owner`s manual

Installation Instructions
INSTALLATION - RECIRCULATING
_-1 INSTALL LOWER SUPPORT FRAME
• Insert lower support frame into the upper support
frame and Iooselg secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no wag to level the
hood after the hood is secured to the frame.
Hood
Mounting _
Flange
:::[:::Fi_7::[: :.L 13-5/8"
/
,- . .,, .... • .. |
€
24" Minimum
30" Maximum
Countertop
II
SECURE WIRING
• Route house wiring through the ceiling hole
and pull a length to reach the hood junction box.
FrontSide
Support_
Frames _ \_
\,\
? ?
g o
? ?
C_eling
House
Wiring
• Tape the wire to the front of the frame support to
prevent damage during installation and service.
_-1 SIZE AND INSTALL DUCTWORK
• Measure from top duct connector (Dim. A)
to bottom of support frame.
- Subtract 3/4" for hood insertion into the bottom
of the frame.
• Cut the 6" dio. duct to the required length.
Ceiling
/
DuctConnector
--...
--....
Side
View
Support
Frame
DuctConnection
ToHood........
.....I.... I
Dim.A
::Required
Duct Duct
Length
=
i
BottomSupport
FrameFlange
NOTE: The bottom end of the duct must be flared
slightlg, to facilitate installation of the hood.
• Install duct up through support frames onto the
duct connector. Push duct up until it is 3/4" from
the bottom of the support frame flange. See
illustration.
• Seal duct connection with duct tape, making sure
the connection is secured in place.
18










