Owner`s manual

Installation Instructions
INSTALLATION -VENTED TO THE OUTSIDE
MOUNT TEMPLATE
Align the template with the marks on the ceiling and
tape in place.
- Be sure the template is oriented correctlLh with the
front of the hood.
Useo plumb to be sure the mounting holes will provide
parallel alignment with the countertop below.
Center punch all hole locations.
Drill pilot holes in the 4 screw
locutions. Use a 5/32" bit and drill
approximatelg 1-1/2" deep.
Cut wire access hole
i
approximatelg 1" diG. Frontof Hood
Cut the 6-1/2" duct opening ' O '
\\ /
through the ceiling. "- - -_"
Wire AccessHole
_-1 INSTALL UPPER SUPPORT FRAME
Secure the upper support frame to the ceiling
joists and/or cross framing with the 4 screws
provided. For maximum rigiditg and strength, the
screws must be driven into the center of the joists
and/or cross-framing.
Check to be sure the support frame is level,
verticallg and horizontallg.
i
Upper J
Support Frol
Frame Of
He(
]art
Frame
Opening
Lower
Support
Frame
_ CheckLevelin
BothDirections
Hood
Mounting
Flange
_-1 INSTALL LOWER SUPPORT FRAME
Insert lower support frame into the upper support
frame and Iooselg secure with 8 screws and
washers (4 on the front and 4 on the back sides).
Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
.....Lowersuppor
ummg_ ///
,ano ii ............i.........
13-5/8"
/
24" Minimum
30" Maximum
Countertop
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no wag to level the
hood after the hood is secured to the frame.
12