Owner`s manual

Installation Instructions
INSTALLATION -VENTED TO THE OUTSIDE
MOUNT TEMPLATE
• Align the template with the marks on the ceiling and
tape in place.
- Be sure the template is oriented correctlLh with the
front of the hood.
• Useo plumb to be sure the mounting holes will provide
parallel alignment with the countertop below.
• Center punch all hole locations.
• Drill pilot holes in the 4 screw
locutions. Use a 5/32" bit and drill
approximatelg 1-1/2" deep.
• Cut wire access hole
i
approximatelg 1" diG. Frontof Hood
• Cut the 6-1/2" duct opening ' O '
\\ /
through the ceiling. "- - -_"
Wire AccessHole
_-1 INSTALL UPPER SUPPORT FRAME
• Secure the upper support frame to the ceiling
joists and/or cross framing with the 4 screws
provided. For maximum rigiditg and strength, the
screws must be driven into the center of the joists
and/or cross-framing.
• Check to be sure the support frame is level,
verticallg and horizontallg.
i
Upper J
Support Frol
Frame Of
He(
]art
Frame
Opening
Lower
Support
Frame
_ CheckLevelin
BothDirections
Hood
Mounting
Flange
_-1 INSTALL LOWER SUPPORT FRAME
• Insert lower support frame into the upper support
frame and Iooselg secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down
to the desired height above the countertop.
Tighten screws.
.....Lowersuppor
ummg_ ///
,ano ii ............i.........
13-5/8"
/
24" Minimum
30" Maximum
Countertop
IMPORTANT: Again, check to be sure the support is
level in both directions. There is no wag to level the
hood after the hood is secured to the frame.
12










