Installation Instructions
12
Installation Instructions
STEP 2B Alternate Mounting Method
“A” Centerline
to Stud and
Keyhole Slots
“B” Hood
Width At
the Top
ZV48R 23-9/16" 47-15/16"
ZV48R 17-9/16" 35-15/16"
ZV36R 14-9/16" 29-15/16"
INSTALL HOOD TO SOFFIT OR BENEATH CABINETS
SKIP THIS STEP IF USING WALL MOUNTING METHOD
When necessary, the hood may be installed so that it is
supportedbythesot.
•Thesotshouldbeconstructedwith2x4’s.
•Determinetheinstallationlocationonthewall.
•Continuethecenterlineforwardonthebottomofthe
cabinetorsot.
•Theopeningabovethehoodshouldallowforthe10"
round duct and clearance to slide the hood back against
the wall.
A
Requires 10-1/2" Min.
Opening For Ductwork
and Hood Installation
A
•The2x4studsmustbelocatedasshowninthechart,
Dim.A.toacceptmountingscrews.
IMPORTANT:Sotframingmustbecapableof
supporting up to 150 lbs.
•Drill1/8"pilotholesintothestudsatthelocationsshown
in the top view illustration.
Install Transition Onto Top of Hood
•Placethetransitionpieceoverthehoodexhaustandse-
cure with 4 screws provided.
•Useducttapetosealtheconnection.Checktobesurethe
damper moves freely.
MountHoodontoSotorCabinet
Note: If mounting to the underside of a cabinet with a re-
cessedbottom,installshimstollthegap.
Duct
Transition
Top of
Hood
•Drivemountingscrewsintothestudsuntiltheyprotrude
1/4".The1/4"gapwillprovideclearancetoengagethe
keyhole slots in the top of the hood.
•Lifthoodtoinstallationposition.Locatehousewiringand
routethroughtheknockout(fromthebackortopofthe
hood).
•Lifthoodontomountingscrews.Slidebackagainstthe
rear wall.
•Tightenmountingscrews.
IMPORTANT: For additional support and to minimize
vibration during operation, the hood must be secured
tothebackwall.Usewallanchorstofastenbottom
backofhoodtothewall.
2"
7-1/2"
A
C
B
2-9/16"
8"
8-1/8"
6"
Back of Hood
Top View
Front of Hood
IMPORTANT: Remove
shipping tape from
damper and check that
damper moves freely.
1/4" Gap
Push Back
to Wall
Add Shims
If Bottom
Is Recessed
Back
Wall
Soffit
Engage Top
Keyhole Slots