Installation Instructions

13
Installation Instructions
STEP 3 CONNECT DUCTWORK
•Installductwork,makingconnectionsindirectionof
airowasillustrated.
•Securejointsinductworkwithsheetmetalscrews.
•Wrapallductjointswithducttapeforanairtightseal.
•Useducttapetosealtheangeconnection.Reach
inside the hood and push the damper up to be sure it
moves freely.
STEP 4 CONNECT ELECTRICAL
STEP 5 INSTALL DUCT COVERS
Note: Foreasierhandling,removecardboardinsertafter
lmispeeledo.
Removeprotectivelmfromductcovers.Ifmorethan
one duct cover is used, secure each piece together with
screws provided.
•Placetheductcover(s)ontopofthehood.
•Frominsidethehood,securetheductcovertothetop
withthesmallPhillipsheadscrewssuppliedwiththe
covers.
Verifythatpoweristurnedoatthesource.
WARNING: If house wiring is not
2-wire with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be sure to
useU.L.approvedanti-oxidantcompound
and aluminum-to-copper connectors.
AVERTISSEMENT– Si le câblage de la
maisonn’estpasdutypeàdeuxlsavecunldeterre,
l’installateurdoitfourniruncircuitdeterre.Quandlesls
de la maison sont en aluminium, il prendre soin d’utiliser
delapâteantioxidationapprouvéeparULetdescon-
necteurs pour l’aluminium-cuivre.
•Usewirenutstoconnectincominggroundtogreen,
white to white and black to black.
•Pushwiresintojunctionboxandreplacecover.Besure
wires are not pinched.
White
Ground
Black
Remove
Junction Box
Cover
Insert Power
Conduit Thru
Strain Relief
and Tighten
Use UL Listed
Wire Nuts
A
B
C
Screw
Duct Tape
Over Seam
and Screw
Air Flow
Duct Tape
Over Transition