Installation Instructions
9
Installation Instructions
STEP 1 CONTINUED
• Arrange cross-framing in the ceiling to suit the existing
structure. See examples.
– Secure each 2 x 4 block with at least four (4) #10 wood
screws, 3" long (not supplied). Use 8 wood screws total
for the two supports.
• The cross-framing must be accurately aligned to
ensure correct positioning of the hood.
• The cross-framing must be level in all directions.
Check with a spirit level and adjust if necessary.
IMPORTANT: The ceiling structure must be capable of sup-
porting the weight of the hood (approximately 300 pounds)
and any inadvertent user contact loads. The hood support
frame will be supported by the 2 x 4 min. cross-framing.
Ductwork
• Use the shortest and straightest duct route possible. For
satisfactory performance, duct run should not exceed
100-feet equivalent length for any duct conguration.
• Refer to “Duct Fittings” chart to compute the maximum
permissible length for duct runs to the outdoors.
• This vent hood must use 8" round duct. The 8" round
duct can transition to 3-1/4" x 12".
• Install the house ductwork to run horizontally between
ceiling joists or straight up through the roof.
Finish the Ceiling
• Finish the ceiling surface. Be sure to mark location of
the ceiling joists and cross-framing. Check to be sure
the ceiling is level; use shims, if necessary.
*Depending on available space.