Installation Instructions

4
ZV1050 Duct Cover Dimensions
A B
ZV1050 11-1/2" 12"
ZX1059 19" 20"
ZX10510 25" 26"
Design Information
DUCT COVER ACCESSORIES
Order the accessory at the same time as the vent hood
and have on-site before installation begins.
Use this chart to accurately determine the need for a Duct
Cover Accessory.
Installation Heights
Actual *Possible Hood
Ceiling Height Installation Height Duct Cover
7'11" 29" Supplied
8'0" 30" Supplied
8'1" 30" Supplied
8'2" 25-1/2" to 30" ZX1059SFSS
8'3" 25-1/2" to 30" ZX1059SFSS
8'4" 25-1/2" to 30" ZX1059SFSS
8'5" 25-1/2" to 30" ZX1059SFSS
8'6" 25-1/2" to 30" ZX1059SFSS
8'7" 25-1/2" to 30" ZX1059SFSS
8'8" 25-1/2" to 30" ZX1059SFSS
8'9" 25-1/2" to 30" ZX1059SFSS
8'10" 25-1/2" to 30" ZX1059SFSS
8'11" 25-1/2" to 30" ZX1059SFSS
9'0" 25-1/2" to 30" ZX1059SFSS
9'1" 25-1/2" to 30" ZX10510SFSS
9'2" 25-1/2" to 30" ZX10510SFSS
9'3" 25-1/2" to 30" ZX10510SFSS
9'4" 25-1/2" to 30" ZX10510SFSS
9'5" 25-1/2" to 30" ZX10510SFSS
9'6" 25-1/2" to 30" ZX10510SFSS
9'7" 25-1/2" to 30" ZX10510SFSS
9'8" 25-1/2" to 30" ZX10510SFSS
9'9" 25-1/2" to 30" ZX10510SFSS
9'10" 25-1/2" to 30" ZX10510SFSS
9'11" 25-1/2" to 30" ZX10510SFSS
10'0" 25-1/2" to 30" ZX10510SFSS
DETERMINE INSTALLATION HEIGHT
*30"
Recommended
36" Min.
*9-ft. to 10-ft. ceilings may be 25-1/2" to 30" clearance.
The distance between the cooking surface and the bottom
of the hood must be at least 25-1/2". The 30" recommended
installation height, above the standard 36” countertop, will
ensure duct cover t to the ceiling. For 9-ft. and 10-ft. ceil-
ing heights, the hood may be lowered to 25-1/2" over the
cooking surface.
When installing the Island Hood above a Monogram Profes-
sional Range or Rangetop, installation clearance must be
at least 30".
IMPORTANT: Clearances may vary due to type of cooking
product and local codes. Check with local inspectors to be
sure standard is applicable.
DUCT COVER DIMENSIONS