Installation Instructions
14
Installation Instructions
STEP 10 CONNECT ELECTRICAL
Verify that power is turned o at the source.
WARNING: If house wiring is not 2-wire
with a ground wire, a ground must be provided by the
installer. When house wiring is aluminum, be sure to use
UL-approved antioxidant compound and aluminum-to-
copper connectors.
AVERTISSEMENT : Si le câblage de
la maison n’est pas du type à deux ls avec un l de terre,
l’installateur doit fournir un circuit de terre. Quand les ls
de la maison sont en aluminium, il prendre soin d’utiliser
de la pâte antioxidation approuvée par UL et des con-
necteurs pour l’aluminium-cuivre.
• Install strain relief onto the knockout of the junction box
cover.
• Insert house wiring through strain relief and tighten.
• Connect white leads to branch circuit white lead.
• Connect black leads to branch circuit black lead.
• Connect green/yellow leads to branch circuit green or
bare ground lead.
• Secure all connections with wire nuts on each electrical
connector.
• Push wires into junction box and replace cover. Be sure
wires are not pinched.
STEP 11
SLIDE DUCT COVER DOWN
• Hold the decorative duct cover and remove the
decorative stop screw from the support frame. Dress
all wire harnesses out of the path of the duct cover
seating.
• Slide the lower duct cover down onto the hood.