Installation Instructions

12
Installation Instructions
STEP 6 SECURE WIRING
Route house wiring through the ceiling hole and pull a
length to reach the hood junction box, approximately 6"
below the support.
STEP 7 SIZE AND INSTALL
DUCTWORK
• Tape the wire to the left side of the frame support to
prevent damage during installation and service.
Measure from house duct ange to bottom of support
frame (Dim. A).
– Add at least 1" for duct overlap at the top.
– Subtract 1-3/4" for hood insertion into the bottom of
the frame to determine required duct length.
Cut the 8" duct length required.
NOTE: The bottom of the duct must be external (female)
connection to the top of the hood. The bottom end should
be ared slightly, to facilitate installation of the hood.
Install duct up through support frames and attach to
house ducting with sheet metal screws.
Seal the connection with duct tape.
Ceiling
Support
Frames
Tape
House
Wiring
Left Side
View