Installation Instructions
12
Installation Instructions
STEP 6 SECURE WIRING
• Route house wiring through the ceiling hole and pull a
length to reach the hood junction box, approximately 6"
below the support.
STEP 7 SIZE AND INSTALL
DUCTWORK
• Tape the wire to the left side of the frame support to
prevent damage during installation and service.
• Measure from house duct ange to bottom of support
frame (Dim. A).
– Add at least 1" for duct overlap at the top.
– Subtract 1-3/4" for hood insertion into the bottom of
the frame to determine required duct length.
• Cut the 8" duct length required.
NOTE: The bottom of the duct must be external (female)
connection to the top of the hood. The bottom end should
be ared slightly, to facilitate installation of the hood.
• Install duct up through support frames and attach to
house ducting with sheet metal screws.
• Seal the connection with duct tape.
Ceiling
Support
Frames
Tape
House
Wiring
Left Side
View