Installation Instructions
10
Installation Instructions
STEP 2 REMOVE THE PACKAGING
The vent hood is packed separately from the decorative
duct cover or accessory covers ZX1059SFSS or
ZX10510SFSS.
• Remove the frame, cover, parts box and packaging.
• Remove junction box cover.
• Install strain relief onto junction box cover.
STEP 3 CHECK INSTALLATION HARDWARE AND ACCESSORIES
Locate the hardware accessory pack shipped with the
hood and check contents.
11-1/4”
TO CENTER LINE
OF HOLES
7-1/4” TO
CENTER LINE
OF HOLES
WIRE
HOLE
ACCESS
WIRE
HOLE
ACCESS
Mounting Screw Holes
2 Phillips-Head
Decorative Screws
4 Filters
4 Lock Washers
Template
Installation/Service
Stop Screw
4 Machine Screws
Support Frames
with 8 Screws
and 8 Washers
4 Hex-Head
Lag Screws
Decorative Duct Covers