Installation Instructions
Table Of Contents
- Design Information
- Advance Planning
- Installation Instructions
- Step 1, Construct Ceiling Support
- Step 2, Remove Packaging
- Step 3, Check Installation Hardware
- Step 4, Mount Template
- Step 5, Install Support Frame
- Step 6, Secure Wiring
- Step 7, Size and Install Ductwork
- Step 8, Install Decorative Duct Covers
- Step 9, Install Hood
- Step 10, Connect Electrical
- Step 11, Slide Duct Cover Down
- Step 12, Install Filters, Finalize Installation
4
ZV1050 Duct Cover Dimensions
A B
ZV1050 11-1/2" 12"
ZX1059 19" 20"
ZX10510 25" 26"
Design Information
DUCT COVER ACCESSORIES
Order the accessory at the same time as the vent hood
and have on site before installation begins.
Use this chart to accurately determine the need for a
Duct Cover Accessory.
Installation Heights
Actual *Possible Hood
Ceiling Height Installation Height Duct Cover
7'11" 29" Supplied
8'0" 30" Supplied
8'1" 30" Supplied
8'2" 25-1/2" to 30" ZX1059SFSS
8'3" 25-1/2" to 30" ZX1059SFSS
8'4" 25-1/2" to 30" ZX1059SFSS
8'5" 25-1/2" to 30" ZX1059SFSS
8'6" 25-1/2" to 30" ZX1059SFSS
8'7" 25-1/2" to 30" ZX1059SFSS
8'8" 25-1/2" to 30" ZX1059SFSS
8'9" 25-1/2" to 30" ZX1059SFSS
8'10" 25-1/2" to 30" ZX1059SFSS
8'11" 25-1/2" to 30" ZX1059SFSS
9'0" 25-1/2" to 30" ZX1059SFSS
9'1" 25-1/2" to 30" ZX10510SFSS
9'2" 25-1/2" to 30" ZX10510SFSS
9'3" 25-1/2" to 30" ZX10510SFSS
9'4" 25-1/2" to 30" ZX10510SFSS
9'5" 25-1/2" to 30" ZX10510SFSS
9'6" 25-1/2" to 30" ZX10510SFSS
9'7" 25-1/2" to 30" ZX10510SFSS
9'8" 25-1/2" to 30" ZX10510SFSS
9'9" 25-1/2" to 30" ZX10510SFSS
9'10" 25-1/2" to 30" ZX10510SFSS
9'11" 25-1/2" to 30" ZX10510SFSS
10'0" 25-1/2" to 30" ZX10510SFSS
DETERMINE INSTALLATION HEIGHT
*30"
Recommended
36" Min.
*9 ft. to 10 ft. ceilings may be 25-1/2" to 30" clearance.
The distance between the cooking surface and the bottom of the
hood must be at least 25-1/2". The 30" recommended installation
height, above the standard 36” countertop, will insure duct cover
fit to the ceiling. For 9 ft. and 10 ft. ceiling heights, the hood may
be lowered to 25-1/2" over the cooking surface.
• When installing the Island Hood above a Monogram Professional
Range or Cooktop, installation clearance must be at least 30".
IMPORTANT: Clearances may vary due to type of cooking product
and local codes. Check with local inspectors to be sure standard
is applicable.
A
B
19"
16"
DUCT COVER DIMENSIONS