Installation Instructions
Table Of Contents
- Design Information
- Advance Planning
- Installation Instructions
- Step 1, Construct Ceiling Support
- Step 2, Remove Packaging
- Step 3, Check Installation Hardware
- Step 4, Mount Template
- Step 5, Install Support Frame
- Step 6, Secure Wiring
- Step 7, Size and Install Ductwork
- Step 8, Install Decorative Duct Covers
- Step 9, Install Hood
- Step 10, Connect Electrical
- Step 11, Slide Duct Cover Down
- Step 12, Install Filters, Finalize Installation
12
Installation Instructions
STEP 6 SECURE WIRING
•Route house wiring through the ceiling hole and
pull a length to reach the hood junction box,
approximately 6" below the support.
STEP 7 SIZE AND INSTALL
DUCTWORK
• Tape the wire to the left side of the frame
support to prevent damage during installation
and service.
Ceiling
Duct
Dim. A
Duct Connection
To Hood
Bottom Support
Frame Flange
House Duct
1-3/4"
Side
View
Support
Frame
Required
Duct
Length
•Measure from house duct flange to bottom of support
frame (Dim. A).
– Add at least 1" for duct overlap at the top.
– Subtract 1-3/4" for hood insertion into the bottom
of the frame to determine required duct length.
•Cut the 8" duct length required.
NOTE: The bottom of the duct must be external
(female) connection to the top of the hood. The
bottom end should be flared slightly, to facilitate
installation of the hood.
•Install duct up through support frames and attach to
house ducting with sheet metal screws.
•Seal the connection with duct tape.
Ceiling
Support
Frames
Tape
House
Wiring
Left Side
View