Installation Instructions
Table Of Contents
- Design Information
- Advance Planning
- Installation Instructions
- Step 1, Construct Ceiling Support
- Step 2, Remove Packaging
- Step 3, Check Installation Hardware
- Step 4, Mount Template
- Step 5, Install Support Frame
- Step 6, Secure Wiring
- Step 7, Size and Install Ductwork
- Step 8, Install Decorative Duct Covers
- Step 9, Install Hood
- Step 10, Connect Electrical
- Step 11, Slide Duct Cover Down
- Step 12, Install Filters, Finalize Installation
10
Installation Instructions
STEP 2 REMOVE THE PACKAGING
The vent hood is packed separately from the
decorative duct cover or accessory covers ZX1059SFSS
or ZX10510SFSS.
• Remove the frame, cover, parts box and packaging.
• Remove junction box cover.
• Install strain relief onto junction box cover.
STEP 3 CHECK INSTALLATION HARDWARE
Locate the hardware accessory pack shipped with the
hood and check contents.
3 Phillips head decorative screws
4 Filters
4 Lock Washers
Template
Service Safety
Stop Screw
Check service manual envelope taped to the side
of the hood to be sure it contains one stop screw.
Leave this screw in the envelope.
Check contents of the accessory package.
4 Machine Screws
Decorative Duct Covers
Support frames
with 8 screws
and 8 washers
4 Hex Head
Lag Screws
Mounting Screw Holes
Attachment
Screw Hole (Left Side)