Installation Guide
31-7000079 Rev.3 5
Standard Installation Preparation
PREPARE THE OPENING
Advantium Built-In Oven can be installed in
combination with other Monogram Built-In appliances.
Always follow each product’s Installation Instructions
to complete the installation.
Single Advantium Built-In Oven Installation:
Order a 30” wide single oven cabinet or cut the
opening in a wall to the dimensions shown.
30”
23-1/2”
25-1/4”
17-1/2”
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four
sides. Must
be able to
support
weight of
oven and
contents.
36-3/4”
Min.
• Allow the following clearances around the cutout
RQWKHIURQWVXUIDFHRIWKHFDELQHWí´IURPWKH
WRSí´IURPWKHVLGHHGJHVDQGí´IURPWKH
bottom.
(Note: these refer to minimum clearances required
for installation and do not reflect actual product
dimensions.)
• Oven overlaps will conceal cut edges on all sides of
the opening.
When installed over a single oven or a warming
drawer, allow at least 2” between the two openings.
This separation will provide clearance for bottom
overlap of the Advantium 120 and the other
appliance overlaps.
• The support must be level and rigidly mounted, flush
with the bottom edge of the cutout.
PREPARE THE OPENING (CONT.)
Installation over a Warming Drawer:
30”
23-1/2”
25-1/4”
17-1/2”
36-3/4”
Min.
2” Min.
(3” Recommended)
Per Warming
Drawer
Requirement
Construct
solid bottom
- Min. 3/8”
plywood
supported
on all four
sides. Must be
able to support
weight of oven
and contents.
NOTE: Additional clearances between the cutouts
may be required. Check to be sure the oven supports
above the Warming Drawer location does not obstruct
the required interior depth and height. See Warming
Drawer installation instructions for details.