Specification Sheet

For questions about your
appliance, please call 1-800-626-2000.
HELPFUL TIPS
Product Specication Created 10/19PAGE 3 OF 5
STANDARD INSTALLATION
ANTI-TIP BRACKET
Use two
additional hole
locations at
end of
brackets
Wall
Studs
Bracket
mounted
into vertical
wall studs
C
Ensure holes
selected are
centered on
the studs
L
FRONT VIEW OF CUTOUT
WITH ANTI-TIP BRACKET
23 5/8" (60)
2 3/8"
(6)
4 7/16"
(11.3)
7/16"
(1.1)
Trim overlap
35 1/2" (90.2)
2 5/16"
(5.9)
3 1/2"
(8.9)
75"
(190.5 )
From floor
to bottom
of electrical
area
*83 1/2" min
*84 1/2" max
(212.1-214.6)
*Trim will overlap
additional 7/16"
E
6"
(15.2)
10"
(25.4)
SIDE VIEW
SIDE VIEW INSTALLED
WITH ANTI-TIP BRACKET
ZICS360NXRH
WATER
5"
(12.7)
5"
(12.7)
3 1/2"
(9.0)
10" (25.4)
WATER
FRONT VIEW
81 1/2"
(207.0)
ZICS360NXLH
Use two
additional hole
locations at
end of
brackets
Wall
Studs
Bracket
mounted
into vertical
wall studs
C
Ensure holes
selected are
centered on
the studs
L
FRONT VIEW OF CUTOUT
WITH ANTI-TIP BRACKET
35 1/2" (90.2)
2 5/16"
(5.9)
*83 1/2" min
*84 1/2" max
(212.1-214.6)
*Trim will overlap
additional 7/16"
3 1/2"
(8.9)
75"
(190.5 )
From floor
to bottom
of electrical
area
SIDE VIEWFRONT VIEW
ELEC.
6"
(15.2)
10"
(25.4)
23 5/8" (60)
2 3/8"
(6)
4 7/16"
(11.3)
7/16
"
(1.1)
Trim overlap
SIDE VIEW INSTALLED
WITH ANTI-TIP BRACKET
WATER
5"
(12.7)
5"
(12.7)
3 1/2"
(9.0)
WATER
10" (25.4)
81 1/2"
(207.0)
A
B
A
Mounting the junction box in this
location will also allow for front
accessability through access panel.
B
Water supply area.
WARNING:
e refrigerator is top heavy and must
be secured to prevent the possibility of
tipping forward. Failure to do so may
result in death or serious injury.
e information below is for cabinet
design only. When installing the anti-
tip system you must use the product
installation instructions.
e information below applies to all
installation constructions:
A wall bracket, bolts and toggles will
be supplied with the unit.
e bolts will be used to attach
bracket to wall in 4 locations. Two
of the locations must penetrate the
center of the wall studs.
e toggles are used for stability in
drywall and when metal studs are
encountered. Lag bolts are used in
wood studs.
In installation opening, measure
81-1/2" from floor and draw a
horizontal line.
Locate and mark the wall studs on
horizontal line. Verify at least two
studs have their centerlines within the
center 32-1/2" of installation opening
to ensure 2 wall studs are penetrated.
e bracket will be centered left to right
in opening with bottom of bracket on the
horizontal line.
When unit is placed in opening, the
bracket tabs will align with openings
in back of the unit. e unit will be
secured to the bracket using supplied
“L” bolts.
See Installation Instructions for
detailed instructions.