ZIK303NPP, ZIC303NPP, ZIK303GNN, ZIW303NPP Mixed Product Triple Installation
4 31-1000576 Rev. 0
TRIPLE INSTALL WITH 30" BF IN CENTER POSITION - 24" COLUMNS
NOTE: These instructions do not replace individual product installation instructions. Refer to 
product installation instructions for full installation process.
Doors Open Independently
1.  Panel required between units: ¾” 
thick and 1 1/2” thick minimum, 3.5-6” 
deep. 
2.  Position of ZIF241 & ZIR241 can be 
interchanged
3.  Heater kits required: ZUG30 installed 
on left side of ZIK30 & ZKUN installed 
on left side of ZIR/ZIF241.
4.  Ensure panel weight does not exceed 
maximum rating.
5.  When installing custom handles, 
ensure handle position allows full door 
opening of adjacent units.
6.  Center unit requires 90° hinge pin.
7.  Each unit needs its own anti tip 
system installed per individual 
installation instructions.
8.  Electrical and water locations for 
each product are per individual install 
instructions.
9.  Mounting template should be adjusted 
by 7/8” from the handle side of the 
door.
24” FZR CLM
ZIF241NPNII
CABINET PANEL
24” REFRIG CLM
ZIR241NPNII
CABINET PANEL
30” CONVERTIBLE
ZIK30GNNII
CABINET PANEL
23-13/16” 23-13/16”
Total opening width: 79-7/8”
24-9/16” column +
3/4” panel opening
25-5/16” column +
panel opening30” ZIK opening
3/4”
Heater Kit
ZUG30
Heater Kit
ZKUN
1-1/2”
Door Panel Width: 
24-7/16"
Door Panel Width: 
29-3/4"
Door Panel Width: 
23-9/16"
NOTE: For independent door 
opening, door panel cannot 
cover 1-1/2" spacer panel.










