Instruction Manual

31-10700-6 7
Installation Preparation
NOTE: Additional clearance between cutouts may be
required. Check to be sure that oven supports above
the Warming Drawer location does not obstruct the
required interior 23-1/2” depth and 9-1/4” height.
INSTALLATION OPTIONS
Models
Dimensions
A B
ZW9000 28-1/2” 30”
ZJ7000 25-1/2” 26-3/4”
When installed under a wall oven:
Warming drawers are approved for installation below
only certain specified wall oven models. See the label
attached to the top of the warming drawer for approved
models.
When installed, the front face of the drawer will be
nearly flush with adjacent cabinetry doors.
Drawer overlaps will conceal cut edges on all sides of
the opening.
The rough opening for the drawer must be:
Depth: 23-1/2” min. from inside back to front of
cabinet frame.
Width: 25-1/2” for 27” wide models, 28-1/2” for 30”
wide models.
– Height: 9-1/4”.
Allow 2” min. between oven and drawer cutouts for
clearance of overlaps.
NOTE: If you are installing in frameless cabinets, it may
be necessary to install 1/2” wide cleats to accept drawer
mounting screws. See drawer for mounting screw
locations.
Installation Below
a Single Oven
Installation Below
a Double Oven
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9” From Floor
to Bottom of Block
1” Min. Above Toekick
Allow 5/8”
Overlap on
All Sides
23-1/2”
Min.
Inside
Oven
Cutout
2” Min.
9”
A
B
9-1/4”
23-1/4”
10-1/2”
2x2 or 2x4 Anti-Tip
Block Against Rear
Wall, 9” From Floor
to Bottom of Block
1” Min. Above Toekick or Adjust
to Oven Installation Height
23-1/2”
Min.
Inside
Oven
Cutout
2” Min.
9”
A
B
9-1/4”
23-1/4”
10-1/2”
Allow 5/8”
Overlap on
All Sides