Installation Instruction
16
31-46542-4
STEP 5 SLIDE UNIT INTO
ENCLOSURE
Roll the unit into the enclosure, being careful not to
pinch the water line or power cord.
Ŷ$ORQJIODWEDURU\DUGVWLFNPD\EHQHHGHGWRJXLGH
the front edge of the anti-tip bracket over the unit.
ŶIf space allows, you may also bend the front edge of
the bracket upward slightly, allowing it to clear the
back of the unit.
ŶRemove Top-Center trim cover from unit.
ŶSecure the unit to the Anti-tip bracket using both
machine screws & washers to engage the threaded
inserts in the anti-tip bracket.
ŶHand start the screws until unit is in desired location
within the install space.
ŶFinalize unit install by tighening the screws fully.
ŶReinstall Trim cover.
Installation Instructions
STEP 6 REMOVE TOEKICK AND
VENT
The toekick must be removed to access
the leveling leg system.
ŶRemove band around EPS block in front of toekick.
ŶRemove and dispose of EPS block.
ŶRemove the solid portion of the toekick by pulling
forward.
Ŷ Place the toekick, vent and screws out of the way so
you will have them for reinstallation.
Vent
Screw
Toekick
Vent
Screws
(behind
toekick)
Screw