Specifications

OPTIONAL
CAPSULE TANK INSTALLATION
Optional capsule tank
kit is
available from your Monitor
dealer.
/h
CAUTION:
The
conversion
of the
Monitor 2200
for use
of
the
capsule
can
present
a
Risk
of
Electrical Shock.
The
necessary Electrical
and
Fuel piping work that
MUST
be
done
ONLY
by an
authorized Servicing Dealer.
Step
1 :
Be
sure
the nut at the
rear lower side
of the
heater
is
secured (See Figure 24).
Step
2:
Remove
the
screws
at the
Front Cover Assy,
and
carefully
remove
the
Front Cover Assy (See Figure 25).
Nipple
Nut
Fig.
24
Front
Cover Assy.
Fig.
25
Step
3 :
Disconnect
the
plugs
of the RED and
BROWN wires
marked
"U"
attached
to the
printed wiring board
to
enable
the
Fuel Empty Float Switch (See Figure 26).
Printed
Wiring Board
Lead
Wires
I—="
Color:
Red/Brown
Marking
:
"U"
Plug
For
Open
Circuit
Fig.
26
17