Specifications

Step 7:lnstall Flue Pipe
B
Wall
Thickness:
5-8'/?
inches
1.
Slide
the
outer flange
and the
rubber packing onto
Flue pipe
B.(Figure
11)
Rubber
Packing
Outer
Flange
Rubber
Packing Outer Flange
Fig.
11
Flue
Pipe
B
2.
Spread caulking material
on the
inside
of the
rubber
packing
if
required.(Figure
12)
Rubber
Packing
Fig.
12
3. It is
important
to
keep
the
"UP" mark
on the
rubber
packing
at the top
while screwing
in
Flue pipe
B.
Hold
the
packing
in
place while screwing
in
Flue
pipe
B
until
it is the
tight. (Figure
13)
Rubber
Packing
UP"
Fig.
13
Flue
Pipe
B
Wall
Thickness:
v«
-5
inches
1.
Set the
Sleeve
Nut on the
Flue Pipe
B and
turn
the
Sleeve
Nut
counterclockwise. Slide
the
Outer Flange
and the
Rubber Packing onto
the
Flue Pipe
B.
(Figure
14)
Rubber
Packing
Outer
Flange
Outer
Flange
Flue
Pipe
B
Sleeve
Nut
2.
Spread caulking material
on the
inside
of the
Rubber
Packing
if
required. (Figure
12)
3. It is
important
to
keep
the
"UP" mark
on the
Rubber
Packing
at the top
while screwing
in the
Flue Pipe
B.
Hold
the
Rubber packing
in
place while screwing
in
the
Flue Pipe
B
until
it is the
tight.
(Figure
13)
4.
Turn
the
Sleeve
Nut
clockwise
and
tighten.
(Figure
15)
Flue
Pipe
A
Rubber
Packing
Outer
Flange
Sleeve
Nut
Flue
Pipe
B
Fig.
15
12