Specifications

Step
7:lnstall
Flue
Pipe
B
Wall
Thickness:
5-8'/?
inches
1.
Slide
the
outer flange
and the
rubber packing onto
Flue pipe
B.
(Figure
10)
Rubber Packing
Outer
Flange
Rubber
Packing
Outer
Flange
Fig.
10
Flue Pipe
B
2.
Spread caulking material
on the
inside
of the
rubber
packing
if
required. (Figure
11)
Rubber
Packing
Fig.
11
3.
It is
imprlant
to
keep
the
"UP"
mark
on the
rubber
packing
at the top
while screwing
in
Flue
pipe
B.
Hold
the
packing
in
place
while
screwing
in
Flue
pipe
B
until
it is the
tight.
(Figure
12)
Rubber
Packing
Fig.
12
Flue
Pipe
B
Wall
Thickness:
3
/s
-5
inches
1.
Set the
Sleeve
nut
onto
Flue
Pipe
B by
turning
the
Sleeve
Nut
counter-clockwise.
Slide
the
Outer Flange
and the
Rubber Packing onto
Flue
Pipe
B.
(Figure
13)
Rubber
Packing
Rubber Packing
y,\
,
~
Outer Flange
Outer Flange
Sleeve
Nut
Fig.
13
Flue Pipe
B
Sleeve
Nut
2.
Spread caulking material
on the
inside
of the
Rubber
Packing
if
required. (Figure
11)
3. It is
important
to
keep
the
"UP"
mark
on the
Rubber
Packing
at the top
while screwing
in the
Flue Pipe
B.
Hold
the
Rubber packing
in
place while screwing
in
the
Flue Pipe
B
until
it is the
tight. (Figure
12)
4.
Turn
the
Sleeve
Nut
clockwise
and
tighten.
(Figure
14)
Flue
Pipe
A
Rubber
Packing
/
Outer
Flange
Sleeve
Nut
Flue
Pipe
B
Fig.
14
13