Owner's Manual
15
71D0530
GCUF Vent-Free Fireboxes
(BLOTMC)
If you are installing the forced air kit on GCUF or GRUF models, see the installation instruc-
tions provided with the kit for electrical wiring requirements, or the blower installation section.
The rebox must be connected to main power supply at time of rebox installation. The blower
must be installed prior to the installation of the vent-free heater. The electrical connections
must be made before the rebox is framed and enclosed in the nished walls.
Optional brass or pewter louver kits may be installed in place of the factory installed black
louvers. Refer to installation instructions provided with the brass or pewter louvers.
Optional trim kits can be used with unit when installed as a free standing replace with
wood surround.
Optional rebrick kits can be installed. See installation instructions provided with kit.
The optional wide canopy can be installed. See installation instructions provided with kit.










