Operating instructions
42D0200
Designer Series Gas Fireplaces
7
It is best to build rebox framing the appliance is set in place. Refer to the dimensions for
your replace on Page 7. The framing headers may rest on the top of the rebox standoffs.
The rebox may be installed directly on a combustible oor or raised on a platform of an appropri-
ate height. Do not place rebox on carpeting, vinyl, or other soft oor coverings. It may, however,
be placed on a at wood, plywood, particle board, or other hard surfaces. Be sure rebox rests on
a solid continuous oor or platform with appropriate framing for support. No cold air should enter
room from under the rebox.
1/2" Drywall 5/8" Drywall
A1 43Z\x" (1105 mm) 43C\," (1102 mm)
A2 39M\," (1013 mm) 39C\v" (1010 mm)
B 41Z\," (1045 mm) 41Z\," (1045 mm)
C 22C\v" (578 mm) 22Z\x" (572 mm)
D 24" (610 mm) 23M\," (606 mm)
A
2
B
A
1
D
A1
A2
C
FP2037
design corner framing
10/08
Gas Connection
2 x 4
(Minimum)
2 x 2
(Minimum)
2 x 4
(Minimum)
FP2037
C
A
2
B
A
1
A1
A2
C
FP2038
designer see thru framing
10/08
2 x 4 (Minimum)
Gas Connection
FP2038
Figure 3 -
Peninsula Framing
Figure 4 -
Corner Unit Framing
(Right Hand Conguration shown)










