Operating instructions

42D0200
Designer Series Gas Fireplaces
7
It is best to build rebox framing the appliance is set in place. Refer to the dimensions for
your replace on Page 7. The framing headers may rest on the top of the rebox standoffs.
The rebox may be installed directly on a combustible oor or raised on a platform of an appropri-
ate height. Do not place rebox on carpeting, vinyl, or other soft oor coverings. It may, however,
be placed on a at wood, plywood, particle board, or other hard surfaces. Be sure rebox rests on
a solid continuous oor or platform with appropriate framing for support. No cold air should enter
room from under the rebox.



1/2" Drywall 5/8" Drywall
A1 43Z\x" (1105 mm) 43C\," (1102 mm)
A2 39M\," (1013 mm) 39C\v" (1010 mm)
B 41Z\," (1045 mm) 41Z\," (1045 mm)
C 22C\v" (578 mm) 22Z\x" (572 mm)
D 24" (610 mm) 23M\," (606 mm)
A
2
B
A
1
D
A1
A2
C
FP2037
design corner framing
10/08
Gas Connection
2 x 4
(Minimum)
2 x 2
(Minimum)
2 x 4
(Minimum)


FP2037
C
A
2
B
A
1
A1
A2
C
FP2038
designer see thru framing
10/08

2 x 4 (Minimum)
Gas Connection

FP2038
Figure 3 -
Peninsula Framing
Figure 4 -
Corner Unit Framing
(Right Hand Conguration shown)