Website:www.mondawe.com CustomerService:service@mondawe.
1、Installation precautions 1. When you open the product packaging, please check the product and accessories at first. If there is any discrepancy, please contact our customer. 2. The hot and cold water supply pipe of the faucet must be properly connected When facing the front of the faucet, the hot water supply is on the left and cold water supply is on the right.Incorrect connection will cause permanent damage to the cartridge. 3.
Allen screw A6 Shower valve handle A7 A8 A8 A4 A7 A5 A6 Allen screw
.Technical drawing of product Unit: inch MD-A3816-MB/BN/BG/ORB 3
. HEAD SHOWER 1/2-14 NPT HOT WATER COLD WATER HAND SHOWER 5
. Pipe connection 1. Please drill the holes on the wall for the main body embedded part, hot and cold water inlet pipes as well as shower arm connection pipes according to the basic product dimension drawing as below. 2. Please make hot and cold water inlet pipe, the mixed water outlet pipe connect with control valve, and tighten with the wrench.
. Water testing and sealing testing 1.After the pipe connection is completed, open the protective panel and cover, and then open the cartridge, flush the pipeline; then close the cartridae to check the pressure resistance and sealing performance of the pipeline, make sure there are no leakage. 2.
. The procedure of sealing the wall Tie surface wall Protective cover is roughly even with tile 8
. 9
. 10
. 11
. 13. Clearance and maintenance In order to keep the faucet appearance smooth and good performance, please follow the below steps to clean and maintain the faucet. 1. Clean with water and dry with a soft cotton cloth. 2. Use a mild liquid and a colorless glass cleaner to remove surface dirt and scale, also you can use the cleaner without grinding function. 3. Do not use detergents, polishing tools, abrasive cloth, paper towels or scrapers to clean the faucet. 4.