Specification

Installation stepsInstallation steps
1
2
1. Insert the screw nut with screws connect the hot and
cool supplyhole in the ground.
3. Insert the main body with
waterpipe, and lock up tighten.
2. Iinsert sliding holder into
waterpipe,connect the
water pipe screwnut and
lock up tightenl.
4. Connect one end of the hose
withthe main body, and connect
theother end with the shower
hand, fixon the supporting fork.
3
4
Installation steps
1.Please check that all components are present.
2.Before installation ensure that all feed lines are clear of debris and
on/off valve is present.
3.Ensure water pressure is between 20-125 PSI (includes combination
of hot and cold feed lines).
4.Pictures in the manual are general in content and may not represent
exactly your purchased faucet. If you are having difficulties please
contact a professional plumber.
5.If you will be away from home for an extended period you should
shut off the main water supply.
6.Please insure that to make a wash for all water pipe before
installation to insure no impurity inside.
7.When you need to welding the shower valve to the water pipe of
the valve , please remember to take out the cartridge and any seal
parts of the valve . When finish welding , need to wait for body of the
valve cool down and then install the cartridge and the seal parts.
8.Need to used the 11-13N.m power to lock the cartridge.
All valve have the pass the the air testing and
pressure testing before ship out. If request
presssure testing before installation,Must under
the guide of the professional Plumber with
license. And air pressure do not over 125PSI. lf
you want to the Brust testing over 50±2PSI,you
need to changed a new cartridge for normal
using.