Specification V1.0
Table Of Contents
- 1 Introduction
- 2 Features
- 3 Application Scenarios
- 4 Product Appearance
- 5 Product Specifications
- 6 Main Functions
- 6.1 LoRaWAN Capabilities
- 6.2 Connect to LoRaWAN network server
- 6.3 ON/OFF Monitoring & Control
- 6.4 Timer Control
- 6.5 Electrical Monitoring
- 6.6 Energy Monitoring
- 6.7 Power Consumption Indicator
- 6.8 Over-voltage/Sag-voltage/Over-current/Over-load Protection
- 6.9 Load Work State Detection
- 6.10 Restore to Factory Setting
- 6.11 Default Power Status
- 6.12 Bluetooth Configuration Tool
- 7 Uplink Payload
- 8 Maintenance instruction
- 9 Revision History
LW005-MP
15 www.mokosmart.com
Load state payload will be sent in Port 13.
➢ Timestamp: Standard UTC time.
➢ Time zone: It is a signed number, convert to decimal, then then divide by 2, and this is UTC
time zone;
➢ Change of load state: 00 means load starts stop; 01 means load starts working
7.9 Countdown Payload
Countdown payload will be sent in Port 14.
➢ Timestamp: Standard UTC time.
➢ Time zone: It is a signed number, convert to decimal, then then divide by 2, and this is UTC
time zone;
➢ ON/OFF state after countdown process ends: 00 means OFF; 01 means ON.
➢ Time remaining of the countdown process: Convert to decimal, the unit is S(second).
Byte 0~3
Byte 4
Byte 5
Timestamp
Time zone
Change of load state
Byte 0~3
Byte 4
Byte 5
Byte 6-9
Timestamp
Time zone
ON/OFF state after countdown process ends
Time remaining of the
countdown process