Installation Guide
866.729.2378 | www.moistureshield.com 5
Tools
Use blue chalk. Other colored chalk may stain your deck.
Fasteners
washer on back with nut. For deck board fasteners, use
decking and railing. If you do not want the screw heads to
Hidden Fasteners
MoistureShield® Deck Clips provide
superior holding power, with a
MoistureShield deck board. Like
our composite decking our clips
are both beautiful and durable, extending the life of your deck by
Installation Tips:
to better gauge screw depth.
Installation Tips:
Every board should be fastened to each joist by a clip
on both sides. For butt joints, add a second joist to
allow for a second clip. See the illustration on page 10.
Step 1:
trim head screw, countersink
the screw into the decking
displaced material.
Step 2: Using your thumb, lightly push
the displaced decking material over
Step 3:
hammer with a smooth head surface,
NOTE: This trick works for Vantage
and Infuse, not Vision or Elevate.
Carbide-tipped
blade with fewer
than 20 teeth.
Carbide-tipped
blade with fewer
than 20 teeth.
Carbide-tipped
blade with fewer
than 20 teeth.
Carbide-tipped
blade with fewer
than 20 teeth.
Building Code Requirements
are reprinted here. Be sure to check your local building code
· Multi-family handrail height generally ranges
· Maximum gap between bottom rail and deck surface is
gap for multi-family applications.
** Spacing note: The precise language is generally “do not allow passage of a
sphere 4" in diameter.”
Be sure to check on the tolerance requirements of your local building code.
1 1A
2
3
Pre-installation
Carbide-tipped
blade with fewer
than 20 teeth
For additional face screw options see page 11 & 12.