Installation Guide

866.729.2378 | www.moistureshield.com 22
TOOLS REQUIRED:



Level

Tape measure
Touch-up paint
ALUMINUM LEVEL RAIL

FOR A SUCCESSFUL INSTALLATION:

Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete with
post locations.
Check local building codes to ensure compliance.

After cutting rails, balusters, or posts, paint exposed metal for maximum protection against the elements.
Installation is best accomplished with two people.


Provided hardware to install MoistureShield
®
Pro Aluminum Rail is for use with MoistureShield
®
Pro Aluminum Posts. If
installing to other surfaces the installer must acquire the appropriate hardware as needed for proper installation.