Installation Instructions
PERFECT
SEAL
PerfectSeal
Installation Guide
Waterproof Laminate Flooring
This document is reviewed on an ongoing basis.
SV_0878 7/20
Horizontal Accent Wall Install Instructions (cont’d)
13. Repeat this process for each plank working your way up to the last row. (Figure 8)
14. For the last row of the installation, use painters tape to mark the stud location for brad nailing. Cut all planks in the last row to
the required width to complete the installation. Complete the installation as you have the earlier rows.(Figure 8a)
15. Use quarter round for inside corners and ceiling. Finish with wall base board of your choice. (Figure 9)
12
8
8a
9
Quarter round
Wall base
Quarter round
Quarter round